ALRO Painting

Our method

Our team supports you!

We coordinate your project from the first exchange to the final delivery. A dedicated contact person ensures clear and constantcommunication throughout the process.

Contact us
equipe-01
equipe-02
equipe-03

Our Working Method

How do we proceed?

Step 1

Receiving
the mandate

We validate the context (parts, volumes, deadlines), appearance expectations (shade, gloss, texture), and functional areas to protect.We confirm the next steps.

reception
Step 2

Preparation
(sandblasting/washing)

We perform the necessary preparation: sandblasting and/or chemical washing, then masking of functional areas. This phaseconditions adhesion, visual regularity, and finish durability.

preparation
Step 3

Paint
application

Controlled application to obtain a uniform appearance and thickness that meets expectations. Visual checks are carried outcontinuously to maintain consistency from one batch to another.

application
Step 4

Quality
control

Inspection at critical points and validation of expected compliance. If necessary, targeted touch-ups before packaging to ensure aclean and uniform result.

controle
Step 5

Delivery

Adapted protective packaging (foams, dividers, covers) and clear labeling: PO, batch, color/texture, part orientation. Delivery slipattached; batch photo available upon request. Dock pickup, planned delivery, or carrier: we coordinate the time slot and handlinginstructions.

livraison